HOME
ABOUT
DRYROOM
SLUDGEDRYER
CASE
NEWS
INSTALL
SERVICE
CONTACT
珠海市金澳源科技有限公司 Zhuhai Hello River Drying Technology
中文
English
自由容器
INSTALL
Step One: Inspection before installation
Step Two: Installation of drying Chamber
Step Four: install the side board.
Step Three: Install the heat pump dryer
Step 5: Install the roof top board.
Step 6: Install the fans.
Step 7: Connect Power
Step 8: Run the test